This project proposes to widen SR 178 to six lanes from Canteria Drive to Masterson Street, and to four lanes from Masterson Street to Miramonte Drive. The project includes signal modifications at Canteria Drive, Alfred Harrell Highway, Masterson Street, and Miramonte Drive.
Project Status:
Preliminary alignment studies and environmental technical studies are underway.
Circulation of the Draft Environmental Document is anticipated in late 2011, and approval of the final environmental document is expected in
late 2011. Construction is anticipated to begin in late 2012.