TRIP - Connecting Bakersfield

HOME
WHAT'S NEW
CONSTRUCTION UPDATE
PROJECTS MAP
SUBSCRIBE TO ALERTS
BID OPPORTUNITIES

PROJECT INFORMATION:

WESTSIDE PARKWAY
SR 58 GAP CLOSURE
SR 178/MORNING DRIVE
SR 99/HOSKING AVE. INTERCHANGE
BELTWAY OPERATIONAL IMPROVEMENTS
ROSEDALE HWY WIDENING
SR 99 AUX LANE/ROSEDALE OFF-RAMP
SR 178 WIDENING
24TH ST IMPROVEMENTS
CENTENNIAL CORRIDOR
HAGEMAN FLYOVER

COMPLETED PROJECTS:

MOHAWK STREET
7TH STANDARD WIDENING
SR 99/7TH STANDARD
SR178/FAIRFAX RD
WEST BELTWAY ROUTE ADOPTION

 

Rosedale Highway Widening Project


 

Project Description:

The project proposes construction of two additional lanes (one in each direction) between Allen Road and Gibson Street. East of Gibson Street, the project would modify lane striping and the median to transition to the existing lane configuration. As a result, State Route 58 would be a six-lane highway from Allen Road to State Route 99. Other improvements would include minor changes, such as restriping approach lanes to provide an additional turn lane on the side street approaches to State Route 58. In addition, a grade-separated rail crossing (the road would go over railroad tracks) would ultimately be built where State Route 58 crosses the San Joaquin Valley Railroad rail line between Mohawk Street and Landco Drive.

Construction of the Rosedale Highway Widening project has been divided into three phases. The first phase will complete the roadway widening between Calloway Drive and State Route 99. This phase is currently advertised for construction bids. The second phase will widen the roadway between Allen Road and Calloway Drive. The grade separation at the railroad, which is shown as an overhead in the final environmental document, will be the final phase. The grade separation is currently programmed in the Regional Transportation Plan for construction in 2015, but the City will continue to seek funding opportunities to advance the project at an earlier date.

 

Project Status:

The project has been advertised for construction with bids due December 17, 2014 at 11 a.m. Construction is expected to begin in early 2015.

 

Documents available for download:

Initial Study with Mitigated Negative Declaration / Environmental Assessment with Finding of No Significant Impact

State Route 58 Widening Project (Rosedale Highway) Biological Opinion

State Route 58 Widening Project (Rosedale Highway) Biological Assessment

State Route 58 Widening Project (Rosedale Highway) Final Community Impact Assessment

Community Impact Assessment Errata Sheet

 

State Route 58 Widening Project (Rosedale Highway) Noise Abatement Decision Report

State Route 58 Widening Project (Rosedale Highway) Historic Property Survey Report

State Route 58 Widening Project (Rosedale Highway) Historical Resources Evaluation Report

Historical Resources Evaluation Report Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Final Noise Study Report

Noise Study Report Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Initial Site Assessment

Initital Site Assessment Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Final Natural Environment Study

State Route 58 Widening Project (Rosedale Highway) Final Natural Environment Study Volume II Appendices

Natural Environment Study Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Final Traffic Operations Report

Traffic Operations Report Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Final Air Quality Study Report

Air Quality Report Errata Sheet

State Route 58 Widening Project (Rosedale Highway) Extended Phase 1 Report

Extended Phase 1 Report Errata Sheet

State Route 58 Widening Approved Project Report and Environmental Document

 

Rosedale_Map